Water supply woes to be resolved with Muara Lassa Bridge: Sarawak CM

Water supply woes to be resolved with Muara Lassa Bridge: Sarawak CM

the Sun Daily - Local·2019-09-08 22:11

DARO, Sarawak: The water supply problems in Pulau Bruit, Daro and Tanjung Manis are expected to be resolved upon completion of the Muara Lassa Bridge project in 48 months, said Sarawak Chief Minister Datuk Patinggi Abang Johari Tun Openg (pix).

He said with the presence of the bridge, it would make possible installation of pipelines, and at a cheaper cost.

……

Read full article on the Sun Daily - Local

SE Asia