Water supply woes to be resolved with Muara Lassa Bridge: Sarawak CM
the Sun Daily - Local·2019-09-08 22:11
DARO, Sarawak: The water supply problems in Pulau Bruit, Daro and Tanjung Manis are expected to be resolved upon completion of the Muara Lassa Bridge project in 48 months, said Sarawak Chief Minister Datuk Patinggi Abang Johari Tun Openg (pix).
He said with the presence of the bridge, it would make possible installation of pipelines, and at a cheaper cost.
……Read full article on the Sun Daily - Local
SE Asia
One-stop lifestyle app dedicated to making life in Singapore a breeze!
Comments
Leave a comment in Nestia App